{"id":869158,"date":"2025-08-30T21:12:27","date_gmt":"2025-08-31T02:12:27","guid":{"rendered":"https:\/\/newsycanuse.com\/index.php\/2025\/08\/30\/five-firms-named-on-223m-northern-ireland-power-lines-framework\/"},"modified":"2025-08-30T21:12:27","modified_gmt":"2025-08-31T02:12:27","slug":"five-firms-named-on-223m-northern-ireland-power-lines-framework","status":"publish","type":"post","link":"https:\/\/newsycanuse.com\/index.php\/2025\/08\/30\/five-firms-named-on-223m-northern-ireland-power-lines-framework\/","title":{"rendered":"Five firms named on \u00a3223m Northern Ireland power lines framework"},"content":{"rendered":"<div id=\"wrapper_sleeve\">\n<p><img width=\"1024\" height=\"683\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/11\/WSP_Power-lines_2.jpg\" alt=\"Wsp power lines 2\"  decoding=\"async\" fetchpriority=\"high\" ><\/p>\n<div>\n<p>Northern Ireland Electricity Networks has awarded a \u00a3222.8m framework for the construction, refurbishment and restringing of overhead transmission lines across the region.<\/p>\n<p>The eight-year deal for five firms is split into two lots and covers overhead lines operating at 33kV, 110kV and 275kV.<\/p>\n<p>The scope includes asset replacement, uprating, emergency repairs and new-build work on both wood pole and steel tower structures, Northern Ireland Electricity Networks said yesterday (28 August) in a contract notice.<\/p>\n<p>Lot one, valued at \u00a311.8m, covers a rolling programme of refurbishment and day-rate emergency response.<\/p>\n<p>Lot two, worth \u00a3211m, involves project-specific new-build and upgrade works.<\/p>\n<p>Murphy International, a subsidiary of tier one contractor Murphy Group, has won a place on both lots.<\/p>\n<p>The framework will run for five years, with an optional three-year extension. It was procured using a negotiated procedure following a prior call for competition.<\/p>\n<div>\n<p><strong>NIE overhead lines framework contractors<\/strong><\/p>\n<p><strong>Lot one \u2013 \u00a311.8m<\/strong><\/p>\n<ul>\n<li>Circet (UK)<\/li>\n<li>Grid Team Services<\/li>\n<li>Aureos Energy<\/li>\n<li>Murphy International<\/li>\n<li>TLI Group<\/li>\n<\/ul>\n<p><strong>Lot two \u2013 \u00a3211m<\/strong><\/p>\n<ul>\n<li>Circet (UK)<\/li>\n<li>Grid Team Services<\/li>\n<li>Killarney Telecommunications<\/li>\n<li>Murphy International<\/li>\n<li>TLI Group<\/li>\n<\/ul>\n<\/div>\n<p><em>Source: <a href=\"https:\/\/www.find-tender.service.gov.uk\/Notice\/052050-2025?origin=SearchResults&#038;p=1\">Gov.uk Find a Tender<\/a><\/em><\/p>\n<\/div>\n<\/div>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/contracts\/five-firms-named-on-223m-northern-ireland-power-lines-framework-29-08-2025\/\" class=\"button purchase\" rel=\"nofollow noopener\" target=\"_blank\">Read More<\/a><br \/>\n Ben Vogel<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Northern Ireland Electricity Networks has awarded a \u00a3222.8m framework for the construction, refurbishment and restringing of overhead transmission lines across the region. The eight-year deal for five firms is split into two lots and covers overhead lines operating at 33kV, 110kV and 275kV. The scope includes asset replacement, uprating, emergency repairs and new-build work on<\/p>\n","protected":false},"author":1,"featured_media":869159,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[204,2023],"tags":[],"class_list":{"0":"post-869158","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-firms","8":"category-named"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/869158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/comments?post=869158"}],"version-history":[{"count":0,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/869158\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media\/869159"}],"wp:attachment":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media?parent=869158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/categories?post=869158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/tags?post=869158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}