{"id":859442,"date":"2025-07-01T22:12:58","date_gmt":"2025-07-02T03:12:58","guid":{"rendered":"https:\/\/newsycanuse.com\/index.php\/2025\/07\/01\/nexans-to-deliver-second-malta-italy-interconnector-ten-years-after-the-first-one\/"},"modified":"2025-07-01T22:12:58","modified_gmt":"2025-07-02T03:12:58","slug":"nexans-to-deliver-second-malta-italy-interconnector-ten-years-after-the-first-one","status":"publish","type":"post","link":"https:\/\/newsycanuse.com\/index.php\/2025\/07\/01\/nexans-to-deliver-second-malta-italy-interconnector-ten-years-after-the-first-one\/","title":{"rendered":"Nexans to deliver second Malta-Italy interconnector, ten years after the first one"},"content":{"rendered":"<div>\n<article id=\"main-content\" data-module=\"datalayer\" data-eventtype=\"article_view\" data-config=\"{\"url\":\"https:\/\/www.offshore-energy.biz\/nexans-to-deliver-second-malta-italy-interconnector-ten-years-after-the-first-one\/\",\"title\":\"Nexans to deliver second Malta-Italy interconnector\",\"author\":\"Nadja Skopljak\",\"id\":766980,\"page_type\":\"article\",\"publication_date\":\"2 months ago\",\"revisions_count\":null,\"is_industry_contribution\":false,\"has_partner\":false,\"is_advertorial\":false,\"categories\":[\"Headline\"],\"topics\":[\"Business Developments &amp; Projects\",\"Infrastructure\",\"Outlook &amp; Strategy\",\"Regulation &amp; Policy\"],\"markets\":[\"Undefined\"],\"regions\":[\"Europe &amp; Eurasia\"]}\">\n<div>\n<p><span><span><a href=\"https:\/\/www.offshore-energy.biz\">Home<\/a><\/span>  <span><a href=\"https:\/\/www.offshore-energy.biz\/markets\/subsea\/\">Subsea<\/a><\/span>  <span aria-current=\"page\">Nexans to deliver second Malta-Italy interconnector, ten years after the first one<\/span><\/span> <\/p>\n<p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tApril 29, 2025,<br \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tby<br \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span><br \/>\n\t\t\t\t\t\t\t\t\t\tNadja Skopljak<br \/>\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n<div>\n<p><strong>Nexans has secured a contract with government-owned Interconnect Malta (ICM) to deliver the second Malta-Sicily interconnector, a new 225 MW high-voltage alternating current (HVAC) link that will reinforce Malta\u2019s electricity system and ensure a stable and resilient energy supply. <\/strong><\/p>\n<p>Under the contract seen as significant, Nexans will deliver high-voltage subsea cables that will be produced at its facility in Charleston, U.S.<\/p>\n<p>The IC2 interconnector will consist of a new ~122-kilometer-long 225 MW HVAC electrical cable interconnection between the Terna substation at Ragusa, Sicily, and the Enemalta terminal station in Maghtab, to be laid in parallel to the\u00a0<a href=\"https:\/\/www.offshore-energy.biz\/following-incident-nexans-and-enemalta-patch-up-subsea-interconnector-gallery\/\" target=\"_blank\" rel=\"noreferrer noopener\">existing HVAC cable link<\/a>, also delivered by Nexans in 2015.<\/p>\n<p><em>\u201cWe are proud to contribute to Malta\u2019s energy infrastructure. Delivering this second interconnector strengthens the energy link between Malta and Sicily, ensuring long-term stability for the country\u2019s electricity supply,\u201d <\/em>said <strong>Pascal Radue<\/strong>, EVP Power Transmission Business Group at Nexans.<\/p>\n<p><em>\u201cBuilding on our longstanding partnership with Interconnect Malta, this project also plays a key role in supporting the country\u2019s transition toward a climate-neutral economy and enabling further investment in renewable energy.\u201d<\/em><\/p>\n<p>The overall interconnector cable link will be composed of a land cable in Sicily, approximately 21 kilometers long, a three-core submarine cable approximately 99 kilometers long, and a 2-kilometer land cable in Malta.<\/p>\n<p>To remind, IC2\u00a0<a href=\"https:\/\/www.offshore-energy.biz\/second-malta-italy-interconnector-gets-final-approval-commissioning-set-for-2026\/\" target=\"_blank\" rel=\"noreferrer noopener\">obtained its final approval<\/a> in January after securing the permit from the Italian Ministry for the Environment and Energy Security (MASE).<\/p>\n<p>This second Malta-Sicily cable link is part of the Maltese Government\u2019s future energy strategy for meeting the 2030 climate and energy targets and the longer-term decarbonization objectives.<\/p>\n<p>The project, co-financed by the European Union under the European Regional Development Fund 2021-2027, is expected to be commissioned in 2026.<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<p> Nadja Skopljak <br \/><a href=\"https:\/\/www.offshore-energy.biz\/nexans-to-deliver-second-malta-italy-interconnector-ten-years-after-the-first-one\/\" class=\"button purchase\" rel=\"nofollow noopener\" target=\"_blank\">Read More<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Home Subsea Nexans to deliver second Malta-Italy interconnector, ten years after the first one April 29, 2025, by Nadja Skopljak Nexans has secured a contract with government-owned Interconnect Malta (ICM) to deliver the second Malta-Sicily interconnector, a new 225 MW high-voltage alternating current (HVAC) link that will reinforce Malta\u2019s electricity system and ensure a stable<\/p>\n","protected":false},"author":1,"featured_media":859443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2181,145004],"tags":[5609,145003],"class_list":{"0":"post-859442","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-deliver","8":"category-nexans","9":"tag-deliver","10":"tag-nexans"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/859442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/comments?post=859442"}],"version-history":[{"count":0,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/859442\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media\/859443"}],"wp:attachment":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media?parent=859442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/categories?post=859442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/tags?post=859442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}