{"id":826081,"date":"2025-02-11T07:11:56","date_gmt":"2025-02-11T13:11:56","guid":{"rendered":"https:\/\/newsycanuse.com\/index.php\/2025\/02\/11\/civils-contractor-bags-207m-hs2-overhead-wiring-contract\/"},"modified":"2025-02-11T07:11:56","modified_gmt":"2025-02-11T13:11:56","slug":"civils-contractor-bags-207m-hs2-overhead-wiring-contract","status":"publish","type":"post","link":"https:\/\/newsycanuse.com\/index.php\/2025\/02\/11\/civils-contractor-bags-207m-hs2-overhead-wiring-contract\/","title":{"rendered":"Civils contractor bags \u00a3207m HS2 overhead wiring contract"},"content":{"rendered":"<div id=\"wrapper_sleeve\">\n<p><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"413\" src=\"https:\/\/emap-romulus-prod.s3.eu-west-1.amazonaws.com\/wp-content\/uploads\/sites\/8\/2023\/02\/Colne-Valley-Viaduct-north-abutment-CGI.jpg\"   alt=\"Colne-Valley-Viaduct-north-abutment-CGI.jpg\"><\/p>\n<p>Colne Valley Viaduct concepts created for HS2 by Grimshaw Architects<\/p>\n<div>\n<p>Civils firm Colas Rail has scooped up a \u00a3206.9m job to develop HS2\u2019s overhead wiring system.<\/p>\n<p>The contractor will now design, manufacture, install and test HS2&#8217;s overhead catenary system (OCS), for 469km worth of track.<\/p>\n<p>That will include overhead wiring to supply electric power for 250 bridges, 58 viaducts, 47 underbridges and 148 overbridges, according to a tender notice released last Thursday (6 February).<\/p>\n<p>Colas Rail&#8217;s OCS will also cover 115 culverts and 99 high-speed turnouts. These are switches enabling trains to move from one track to another at speeds of up to 230 kilometres per hour.<\/p>\n<p>In addition, the contractor&#8217;s work will cover 32 low-to-medium speed turnouts (where trains will run at up to 100km per hour) and four complex track junctions.<\/p>\n<p>The project is not the first HS2 construction job involving Colas Rail. Last April, <em>Construction News <\/em>visited the station box at HS2\u2019s Old Oak Common station in London \u2013 where <a href=\"https:\/\/www.constructionnews.co.uk\/project-reports\/delivering-hs2s-old-oak-common-station-box-30-04-2024\/\">the firm is providing infrastructure for six overground tracks<\/a>.<\/p>\n<p>Colas Rail generated a pre-tax profit of \u00a327.9m from <a href=\"https:\/\/www.constructionnews.co.uk\/civils\/profit-boost-as-rail-specialists-turnover-exceeds-400m-28-10-2024\/\">record turnover of \u00a3403.7m<\/a> in its most recent accounts for the 2023 calendar year.<\/p>\n<p>In contrast, its sister firm Colas Limited described\u00a0<a href=\"https:\/\/www.constructionnews.co.uk\/financial\/colas-closes-division-after-irrecoverable-project-costs-07-01-2025\/\"> \u201cincreasing, irrecoverable costs\u201d<\/a> on a number of projects in 2023 in its most recent accounts. The firm decided in November 2023 to scrap its regional business units as a consequence.<\/p>\n<p>HS2 has also faced a challenging start to the year. Last month, <a href=\"https:\/\/www.constructionnews.co.uk\/government\/new-hospitals-programme-set-to-fail-ipa-warns-17-01-2025\/\">the Infrastructure and Projects Authority gave it a red &#8216;unachievable&#8217; rating<\/a> for the second consecutive year.<\/p>\n<p>Also in January, HS2 <a href=\"https:\/\/www.constructionnews.co.uk\/civils\/hs2\/hs2-lodges-curzon-street-redesign-application-09-01-2025\/\">submitted a new design for its Curzon Street terminus in Birmingham.<\/a><\/p>\n<p>HS2 obtained outline planning permission for Curzon Street in 2020, with early works starting last year.<\/p>\n<\/div>\n<\/div>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/hs2\/civils-contractor-bags-207m-hs2-overhead-wiring-contract-10-02-2025\/\" class=\"button purchase\" rel=\"nofollow noopener\" target=\"_blank\">Read More<\/a><br \/>\n Joshua Stein<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Colne Valley Viaduct concepts created for HS2 by Grimshaw Architects Civils firm Colas Rail has scooped up a \u00a3206.9m job to develop HS2\u2019s overhead wiring system. The contractor will now design, manufacture, install and test HS2&#8217;s overhead catenary system (OCS), for 469km worth of track. That will include overhead wiring to supply electric power for<\/p>\n","protected":false},"author":1,"featured_media":826082,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[104325,26535],"tags":[],"class_list":{"0":"post-826081","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-civils","8":"category-contractor"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/826081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/comments?post=826081"}],"version-history":[{"count":0,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/posts\/826081\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media\/826082"}],"wp:attachment":[{"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/media?parent=826081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/categories?post=826081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsycanuse.com\/index.php\/wp-json\/wp\/v2\/tags?post=826081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}