Bechtel to build EV charging infrastructure

An article from
site logo

Project Wins

The Reston, Virginia-based contractor sees the sector as a “very high priority,” per a company executive.


Published March 15, 2023

A tall building with the Bechtel logo on the top on a clear and sunny day.


The company is bullish on its future in EV work.


Permission granted by Bechtel

Award: Charging stations for electrification project
Value: Withheld
Location: Western U.S. state school district
Client: First Student

Reston, Virginia-based Bechtel was selected by school transportation service First Student to design and build charging stations for one of its electrification projects in the U.S., the contractor announced last week. Bechtel declined to provide the cost of the project.

Bechtel will provide engineering, procurement and construction services for the new charging stations, per the release, and the two companies plan to partner on future projects.

The project is a stepping stone in First Student’s plans to electrify 30,000 vehicles in its fleet by 2035, according to the release. There is increasing demand for EV batteries and infrastructure throughout the U.S. and projects across the EV spectrum are receiving billions in federal funding.

Bechtel considers the burgeoning field of EV infrastructure and electrification to be a “very high priority,” Catherine Hunt Ryan, president of the company’s manufacturing and technology business, told Construction Dive in an interview. “We are focused on projects across the entire battery value chain. It’s the full package.”

Bechtel provides a range of services in the electrification market, according to the release, including feasibility studies, site selection, front-end engineering design, procurement services, construction management and project management. Justin Britt, general manager of electric vehicles at Bechtel, stressed the value the company is placing in the EV industry.

“Building a future of vehicle electrification means investing in infrastructure today in everything from raw material extraction, processing plants, battery component manufacturing, final assembly, charging stations and recycling,” Britt said in the release.

Read More
Matthew Thibault

Business seminar in Munich highlights Hong Kong’s strategic roles amidst global shifts (with photos)

Business seminar in Munich highlights Hong Kong's strategic roles amidst global shifts (with photos) ******************************************************************************************      The Hong Kong Economic and Trade Office, Berlin (HKETO Berlin), promoted Hong Kong's unique advantages and strategic roles at the seminar "Hong Kong's strategic role amidst geopolitical tensions" on June 18 (Munich time) in Munich, Germany.             Senior executives, investors

AI for business services: From job fears to productivity

AI for business services: From job fears to productivity

Business Insurance-AZ Achieves Record Response Times for 2026 Arizona Construction Bids

Business Insurance-AZ achieves milestone response speeds for commercial construction bids across Arizona, accelerating documentation delivery to keep local projects moving forward without delay. Phoenix, AZ, June 06-2026, ZEX PR WIRE — Business Insurance-AZ has achieved record-breaking processing speeds and response times for commercial construction bids throughout Arizona, directly supporting the state’s massive infrastructure and advanced manufacturing boom